| Season
Dates |
November 24, 2010 through
April 3, 2011
|
| Lift
Operating Hours |
9:00 a.m. - 4:00 p.m.
East River Lift and High Lift close at 3:30 p.m.
North Face Lift closes at 3:00 p.m.
|
|
Elevation |
Summit - 12,162 feet (3,707
meters)
Base - 9,375 feet ( 2,856 meters)
Lowest Lift - 9,100 feet (2,774 meter)
|
|
Vertical Drop |
Lift Served - 2,775 feet
(846 meters)
Overall - 3,062 feet (933 meters)
requires a short hike to Peak Terrain |
| Skiable
Acres |
1,167 acres (472 hectares)
|
Snowmaking
|
282 acres (114
hectares) serviced by 14 of 16 lifts |
| Lifts |
16 total
4 high speed detachable quads
2 fixed grip quads
2 triple chairs
3 double chairs
3 surface lifts
2 magic carpets |
| Lift
Capacity |
20,310 people
per hour
|
| Trails |
121 Total
23% beginner
57% intermediate
20% advanced
|
| Longest
Run |
2.6 miles (4.2 km)
Peak to Treasury
|
| Terrain
Parks |
CBMR introduces the new
GoldLinkTerrainPark and Superpipe for the
2010-2011 season. By relocating the resort’s largest park and pipe,
crews have created a complete freestyle park pod off the Painter Boy and
Goldlink lifts. This translates to a literal playground for the park
enthusiast, highlighted by the ability to progress from one park – and
one feature size – to the next The Cascade location also is ideal for
larger park features, offering a consistent fall line for the jib park
and half pipe. Cascade is blessed with good afternoon light, allowing
for better visibility, and it’s proximity to mountain operations
headquarters means snowcat operators have easier access and more time
for preening features. The new location also leaves crews hopeful for
delivery of a constructed half pipe in time for the Christmas holiday,
thanks to the park’s location along the main water feed pipe for the
mountain’s snowmaking system
|
|
Superpipe |
Located
in the new Cascade Terrain Park off of the Painter Boy Lift
55 feet wide, 18 feet high, 17
degree slope
|
|
Snowfall |
300 inches per year |